Dan Carpenter

Dewatering in Oshawa

WJ’s Canadian branch opened in the centre of Toronto in 2016 to work on the Toronto Eglinton Crosstown LRT project, a project we are still working on 3 years later! This is however not the only project we have been working on since we arrived in Canada. One of our most recent other projects took

WJ expand in to Kuwait

WJ have been an established part of the dewatering game in the Middle East for over 15 years now since providing the dewatering for the Dubai International Airport Terminal 3 development back in 2003, with offices in Dubai since 2005 and our Qatar office due to celebrate its tenth anniversary in 2019. January this year

Thames Tideway – WJ featured in the National Press!

It’s not often WJ are featured in the national press, however we very recently had the honour of appearing in articles on both the Daily Mail and London Evening Standard websites about the Thames Tideway project currently underway through central London. Much of the current sewer network underneath London date back to the mid-19th century

UK Project Update – Anchorsholme Outfall Cofferdam

WJ are once again showing our technical prowess with another challenging project in Anchorsholme; dewatering a cofferdam in the Irish Sea! WJ have been working in and around Blackpool for several years now, having completed the Anchorsholme Park Storage Phase 1 and Phase 2 works for Ward and Burke and the Lennox Gate project for

WJ Engineer’s Sporting Success!

This week WJ are proudly celebrating the success of one of our colleagues away from the field of groundwater management! Chris Robson, one of our monitoring engineers based in our UK office, has a long history in football having had a successful playing career before gaining his UEFA B coaching license. Chris is now manager

WJ Invest in new Large Capacity Pumps

WJ Groundwater have a long and enviable reputation as technical leaders in the dewatering industry, renowned for being able to provide a professional and practical solution to groundwater problems. In order to reinforce this position, and to enhance our reputation as the ‘go to’ company for overpumping, WJ have invested in some new larger capacity

WJ Middle East Reaches New Heights

WJ Groundwater have been celebrating once again following receipt of our ISO 9001:2015 Quality Management Systems certification, to add to our existing ISO 14001 and 18001 certificates. The ISO 9001:2015 certification, awarded to WJ by Bureau Veritas, demonstrates the quality management systems and processes that have been put in place in our Dubai, Abu Dhabi

WJ’s Sporting Success

At WJ we are defined by our people, and in order to allow them and the company as a whole to flourish and reach new heights, teamwork and a healthy body and mind are crucial.   WJ have a long established sporting pedigree on all levels with their involvement with Team Frankie’s, who have taken

Introducing WJ’s new drilling rig!

Last week WJ took receipt of a new Soilmec SM14 drilling rig. A welcome addition to WJ’s already extensive fleet of drilling rigs both in the UK and across the world! Soilmec are internationally renowned and respected suppliers of drilling rigs, who WJ have had a long partnership, and the SM14 is the latest addition