Sewage Bypass at Dubai Downtown

wj-sewage-dubai

Over pumping for existing Network Upgrade

We have installed, commissioned and operated a temporary over pumping system at Down Town Dubai to facilitate construction of service tunnels and roads in the area. The existing sewer network was diverted through our temporary setup. The pumping station had a peak flow of 1500 m3/hr.

Share

Related Projects

Stormwater Bypass, Nakheel Metro Station

Stormwater Bypass, Nakheel Metro Station

Over pumping for the upgrade of existing Metro Station Description: The Nakheel Harbour and Tower (NHT) Station upgrade is a part of the Dubai Metro expansion works and it is located on Ibn Battuta Street. The Red Line Metro extension to Expo 2020 site shall intersect at NHT Station. WJ Groundwater Limited undertook the storm

The Garden Sewage Treatment Works

The Garden Sewage Treatment Works

WJ undertook sewage over pumping works as part of maintenance works at The Gardens Sewage Treatment Works in Dubai. WJ were contracted by Hydrojet to divert incoming mains sewage from the works inlet to the neighbouring aeration tanks whilst they carried out maintenance works at the pumping station for Nakheel. WJ installed a high performance