Stormwater Bypass, Nakheel Metro Station

Over pumping for the upgrade of existing Metro Station

Description: The Nakheel Harbour and Tower (NHT) Station upgrade is a part of the Dubai Metro expansion works and it is located on Ibn Battuta Street. The Red Line Metro extension to Expo 2020 site shall intersect at NHT Station. WJ Groundwater Limited undertook the storm water & sewage over pumping works using our high capacity diesel centrifugal pumps. We installed our heavy-duty temporary HDPE discharge bypass lines up to 250m in length. The over pumping system was operated and monitored by WJ personnel continuously throughout the project. A flowmeter was used to monitor the system flow rate. WJ Groundwater has also successfully executed and installed our advanced deep line plugging system to divert flows.

Share

Related Projects

The Garden Sewage Treatment Works

The Garden Sewage Treatment Works

WJ undertook sewage over pumping works as part of maintenance works at The Gardens Sewage Treatment Works in Dubai. WJ were contracted by Hydrojet to divert incoming mains sewage from the works inlet to the neighbouring aeration tanks whilst they carried out maintenance works at the pumping station for Nakheel. WJ installed a high performance

Stormwater Bypass near Jumeirah

Stormwater Bypass near Jumeirah

Over pumping from manhole for constructing additional downstream manhole Dubai Municiaplity continue to invest and build on their existing utility network in Dubai. As part of upgrades, WJ Middle East undertook the storm water by pass works from manhole to manhole at Jumeirah using our high capacity diesel centrifugal pumps. We installed our heavy-duty temporary HDPE