Over pumping from manhole for constructing additional downstream manhole
Dubai Municiaplity continue to invest and build on their existing utility network in Dubai. As part of upgrades, WJ Middle East undertook the storm water by pass works from manhole to manhole at Jumeirah using our high capacity diesel centrifugal pumps. We installed our heavy-duty temporary HDPE discharge bypass lines up to 100m in length. We had anticipated large volume of flows through the main network as it was near the outfall point. WJ successfully diverted the flows with no impact to the main network.